Painting Repair Cost Boston, MA
What Touching Up Peeling Exterior Paint Costs in Boston
Work out a Boston peeling-paint touch-up from the $27.80 BLS painter wage: $394 to $3,169 across three job sizes, with each step shown.
Touching up peeling exterior paint on a Boston house works out to about $390 to $620 for spot repairs, $1,040 to $1,630 for one wall of siding and trim, and $2,080 to $3,170 for two walls. These figures come from the $27.80 median Boston painter wage, a 2x to 3x overhead multiplier and a material allowance, all shown below. They are calculations, not quotes.
Key points
- The 2025 BLS median wage for painters in the Boston area is $27.80 per hour, which is $4.05 (17.1%) above the $23.75 national median.
- At an assumed 2x to 3x overhead multiplier, one billed painter hour in Boston is about $55.60 to $83.40.
- A one-wall repair of 16 crew-hours comes to about $1,040 to $1,634 once a $150 to $300 material allowance is added.
- The BLS prepared paint price index rose 5.0% in the twelve months to September 2026, which adds only about $7.50 to $15 to a typical touch-up material allowance.
- Dividing a quote’s labor portion by its stated hours and then by $27.80 shows which multiplier the contractor is applying.

What does federal wage data say Boston painters earn?
The BLS Occupational Employment and Wage Statistics (OEWS) program reports a 2025 median of $27.80 per hour for Painters, Construction and Maintenance (SOC 47-2141) in the Boston area. The series ID is OEUM001446000000047214108, and the figures below were pulled from the BLS OEWS Boston series on 2026-10-29. The supplied data does not state a release date, so none is given here.

| Area | 25th percentile | Median | 75th percentile | Mean | Employed |
|---|---|---|---|---|---|
| United States | $21.46 | $23.75 | $29.65 | $26.64 | 225,190 |
| MA statewide | $22.51 | $27.65 | $33.68 | $30.81 | 4,430 |
| Boston, MA | $23.30 | $27.80 | $33.92 | $31.21 | 3,220 |
All figures are dollars per hour paid to workers. The same source lists a median of $48.02 per hour for first-line supervisors of construction trades in Boston, which matters if a lead or foreman spends time on your job. For duties, entry requirements and national pay context, see the BLS Occupational Outlook Handbook profile for painters.
Why is a painter’s wage not the price on my quote?
A wage is what the worker takes home before their own taxes. A quote also has to pay for everything around the worker: payroll taxes, workers’ compensation, liability insurance, the van and fuel, ladders and sprayers, office time, a warranty reserve and profit. Contractors express this as a burden and overhead multiplier on the wage.

This article uses a multiplier of 2.0 to 3.0 times the wage. That is an assumption, a common working range for small residential contractors, and not a number BLS measures. At the Boston median it gives:
- 2.0 × $27.80 = $55.60 per billed labor hour
- 3.0 × $27.80 = $83.40 per billed labor hour
A one-person firm with low overhead may sit near the bottom of that range. A firm with an office, several trucks and a longer warranty may sit at or above the top. Your quote can legitimately fall outside the range, but the contractor should be able to say why.
What job sizes does this calculation assume?
Peeling paint is rarely uniform, so three job sizes are used. Each is an assumption about scope, not a measurement of any house. Hours cover scraping, sanding, caulking, spot priming, two coats on the patched areas, setup and cleanup.
| Scenario | What it looks like | Crew | Crew-hours | Materials allowance |
|---|---|---|---|---|
| A. Spot repair | Peeling on a door, porch rail or a few window sills | 1 painter × 6 hrs | 6 | $60 to $120 |
| B. One wall | One elevation of siding and trim, patch-scraped and spot-primed | 2 painters × 8 hrs | 16 | $150 to $300 |
| C. Two walls | Two elevations, with ladder work on a taller house | 2 painters × 16 hrs | 32 | $300 to $500 |
For scenario B, one plausible split of the 16 crew-hours is 7 hours of scraping and sanding, 3 hours of caulk and spot primer, 4 hours of finish coats and 2 hours of setup and cleanup. Prep dominates because paint only holds on a sound, clean surface. Materials cover scrapers, sandpaper, caulk, primer, finish paint, tape and drop cloths. The material figures are assumed allowances, not prices taken from a source.
How is the cost built up, step by step?
The formula is crew-hours × wage × multiplier + materials. The wage is the Boston median of $27.80.
| Step | A. Spot repair | B. One wall | C. Two walls |
|---|---|---|---|
| Crew-hours (assumed) | 6 | 16 | 32 |
| Wage cost: hours × $27.80 | $166.80 | $444.80 | $889.60 |
| Labor at 2.0× | $333.60 | $889.60 | $1,779.20 |
| Labor at 3.0× | $500.40 | $1,334.40 | $2,668.80 |
| Materials, low / high (assumed) | $60 / $120 | $150 / $300 | $300 / $500 |
| Total, low (2.0× + low materials) | $393.60 | $1,039.60 | $2,079.20 |
| Total, high (3.0× + high materials) | $620.40 | $1,634.40 | $3,168.80 |
Worked through for scenario B, the low end is 16 hours × $27.80 = $444.80 in wages. Multiply by 2.0 to get $889.60, then add $150 of materials for $1,039.60. The high end multiplies the same $444.80 by 3.0 to get $1,334.40, then adds $300 for $1,634.40.
Pairing the low multiplier with low materials and the high multiplier with high materials gives the widest honest band. A real job would likely land somewhere inside it, not at either edge.
How much more does Boston cost than the national average?
The Boston median wage is $4.05 per hour above the national median, which is 17.1% higher ($4.05 ÷ $23.75). Repeating scenario B with the national median of $23.75 and identical hours and materials shows what that wage gap does to the total.
| Scenario B, 16 crew-hours | National median wage | Boston median wage | Difference |
|---|---|---|---|
| Wage cost: hours × wage | $380.00 | $444.80 | $64.80 |
| Total, low (2.0× + $150) | $910.00 | $1,039.60 | $129.60 (14.2%) |
| Total, high (3.0× + $300) | $1,440.00 | $1,634.40 | $194.40 (13.5%) |
The percentage gap in the total is smaller than 17.1% because the material allowance is held equal. Paint and supplies do not get 17% more expensive just because the painter works in Boston, so the wage gap only acts on the labor portion.
Other comparisons from the same data: the Boston 25th percentile is $1.84 (8.6%) above the national one, the 75th percentile is $4.27 (14.4%) above, and the mean is $4.57 (17.2%) above. Boston painters are paid about the same as the Massachusetts median of $27.65, so this is a statewide pay level more than a city quirk.
How sensitive is the result to wages, crew mix and paint prices?
Three inputs move the answer: where in the wage range your contractor’s crew sits, whether a supervisor is on site, and the cost of paint.
Wage level. Not every Boston painter earns the median. Scenario B at the 25th and 75th percentile wages:
| Scenario B | 25th percentile ($23.30) | Median ($27.80) | 75th percentile ($33.92) |
|---|---|---|---|
| Wage cost, 16 hrs | $372.80 | $444.80 | $542.72 |
| Total, low (2.0× + $150) | $895.60 | $1,039.60 | $1,235.44 |
| Total, high (3.0× + $300) | $1,418.40 | $1,634.40 | $1,928.16 |
A crew paid at the 75th percentile can reasonably produce a bid about $200 to $290 above the median case, with nothing wrong in the quote.
Supervisor time. If a lead at the Boston supervisor median of $48.02 per hour covers 2 of the 16 hours, each swapped hour adds $20.22 in wages ($48.02 − $27.80). Two hours adds $40.44 in wages, or about $80.88 to $121.32 after the 2.0× to 3.0× multiplier. That is a small shift, and it can be a good use of money on a detailed repair where someone needs to judge which boards have failed paint and which have rot.
Paint prices. The BLS producer price index for prepared paint (series WPU0621, 1982 = 100) stood at 452.904 in September 2026 against 431.420 a year earlier, a 5.0% rise. Index points are not dollars and cannot be turned into a gallon price. They can show direction. If the $150 to $300 allowance had risen in step, the increase is about $7.50 to $15, which is under 1% of the scenario B total. Paint inflation matters little for a touch-up and much more for a full repaint.
What can this calculation not see?
The build-up covers labor and a rough materials allowance. A real job can differ for reasons the wage data cannot show:
- Lead paint. Older homes may have lead-based paint under later coats. Scraping it can require different methods, containment and cleanup, which changes hours and cost. This calculation does not price that.
- Rot and substrate repair. Peeling is sometimes a symptom of moisture. If boards or trim are soft, carpentry comes before paint and is a separate trade with its own wage.
- Access and height. Ladders on a one-story wall are one thing. Staging, lifts or roof-edge work on a tall or steep house raise hours, equipment cost and insurance exposure.
- Permits and rules. A touch-up usually needs no permit, but historic districts, condominium associations and rental properties can impose color, material or approval requirements.
- Disposal. Paint chips and debris have to be contained and removed. Handling rules and fees vary by municipality.
- Season and weather. Exterior paint needs dry surfaces and suitable temperatures. A job pushed into a short weather window or a busy season may carry a scheduling premium, and rain days add return trips.
- Emergency call-outs. Rush work, for example before a sale closing or an inspection, can carry a premium that is not in a median wage.
- Minimum charges. Many small contractors have a minimum job price. A true half-day spot repair may be billed above what hours × multiplier suggests.
How do I read a real quote against these numbers?
Start by asking that the quote be itemised. At minimum you should see these lines:
- Labor hours and crew size. The number of people and total hours, not just a lump sum.
- Prep scope. Scraping, sanding, caulking and priming named separately from finish coats.
- Materials. Primer and paint products by type, with quantities or an allowance.
- Extras. Staging or lifts, lead-safe work, disposal, carpentry repairs, each on its own line.
- Exclusions and warranty. What is not covered and for how long the work is guaranteed.
Then ask the one question that exposes a padded bid: “How many total labor hours is this price based on?” A contractor who knows the job can answer in a sentence. A vague answer is a warning.
With the hours in hand, back out the implied multiplier: (quote − materials) ÷ hours ÷ $27.80.
- A $1,500 quote for scenario B with 16 hours and $200 of materials: ($1,500 − $200) ÷ 16 = $81.25 per hour, and $81.25 ÷ $27.80 = 2.9×. That sits inside the 2x to 3x assumption.
- A $2,200 quote for the same job: ($2,200 − $200) ÷ 16 = $125.00 per hour, and $125.00 ÷ $27.80 = 4.5×. That is well outside the range, so ask what is behind it, such as staging, lead-safe work, a rush schedule or more hours than the scope suggests.
A multiplier above 3 is not proof of padding, and one below 2 is not proof of a bargain. Very low figures can mean unlicensed work, no insurance or skipped prep, and skipped prep is what makes paint peel again. Use the number to ask questions, not to reach a verdict.
If the peeling covers most of a wall, ask for two prices: patch-and-spot-prime and a full repaint of that wall. Prep hours are largely fixed by the failed area, so a repaint sometimes adds less than expected and gives a uniform finish. A patched wall can show the repair in different sheen or color. This site cannot say which is cheaper for your house, so make the contractor price both.
What should I check before signing?
- Hours and crew are written down. The quote lists people and total hours, and you have calculated the implied multiplier.
- Materials are named. Primer and finish paint types are stated, and the quote says whether they are exterior-grade.
- Substrate is addressed. The contractor has looked at whether rot or moisture is causing the peeling and the quote says who fixes it.
- Older-home hazards are covered. If your house is older, the quote says how lead paint is handled or confirms it was ruled out.
- Insurance is proven. You have seen current liability and workers’ compensation coverage, not just been told about it.
- Scope and exclusions are explicit. Staging, disposal, extra coats and weather delays are included or priced as extras.
- Payment tracks progress. A small deposit and a balance after you have inspected the finished work is safer than paying in full upfront.
- Warranty is in writing. It states what is covered, such as peeling or blistering, and for how long.
- You have more than one bid. Compare implied multipliers, not only totals.
How this was calculated, and what it is not
This site does not inspect homes, survey contractors or collect quotes. Every wage and index figure above comes from the BLS pages linked in the article, pulled on 2026-10-29. The crew-hours, the 2x to 3x multiplier and the material allowances are assumptions chosen for illustration, and the totals are derived arithmetic rather than measured prices. They are a yardstick for reading a bid, not a substitute for one.
Read next
Common questions
- How much does it cost to touch up peeling exterior paint in Boston?
- Using the BLS Boston median painter wage of $27.80 per hour, a 2x to 3x overhead multiplier and a material allowance, a spot repair of about 6 crew-hours comes to roughly $394 to $620. One wall of siding and trim at 16 crew-hours comes to roughly $1,040 to $1,634. Two walls at 32 crew-hours comes to roughly $2,079 to $3,169. These are derived estimates, not quotes.
- Why is my quote higher than the $27.80 hourly wage times the hours?
- The $27.80 figure is what a Boston painter is paid, not what you are billed. A contractor's price also covers payroll taxes, workers' compensation, liability insurance, vehicles, tools, office time, warranty reserve and profit. This article assumes a multiplier of 2 to 3 times the wage, which turns $27.80 into about $55.60 to $83.40 per billed labor hour. That multiplier is an assumption, not a measured figure.
- How much more does Boston cost than the national average for painting labor?
- The BLS median painter wage is $27.80 per hour in Boston against $23.75 nationally, a gap of $4.05 or 17.1%. For a 16 crew-hour wall repair with the same materials, that gap adds about $130 to $194 to the labor portion, which is roughly 13.5% to 14.2% of the total once materials are included. The gap is in wages only, and your quote may differ for other reasons.
- How can I tell if a painting quote is padded?
- Ask how many total labor hours the price is based on. Subtract the materials line from the quote, divide by those hours, then divide by $27.80. A result between about 2 and 3 is inside the range used here. A $2,200 quote with 16 hours and $200 of materials works out to 4.5 times the wage, which needs an explanation such as staging, lead-safe work or a scheduling premium.
- Does paint price inflation change the estimate much?
- Only slightly for a touch-up. The BLS producer price index for prepared paint rose 5.0% over the twelve months to September 2026, from 431.420 to 452.904. If you assume a $150 to $300 material allowance moved with that index, the increase is about $7.50 to $15. The index is a wholesale measure in index points, so it shows direction, not what you pay at the store.
Sources — checked Oct 29, 2026
- BLS OEWS — Painters, Construction and Maintenance, Boston, MA
- BLS Occupational Outlook Handbook — Painters, Construction and Maintenance
- BLS Producer Price Index — Prepared paint
Wage and price index figures are taken from the sources above on the date shown. Wage data is released annually and price indexes monthly, so both move. Everything here is a calculated estimate, not a quote — get a written bid from a licensed local contractor before committing to work. See how the numbers are built.